-Launching gantries

-Special launching carriers

-Special erecting machines

-Service equipment and  devices for bridge erection

Methodology for Accelerated

Bridge Construction (ABC)

•AWIT focus on opportunities with challenging situations  for  heavy lifting and carrying on bridge construction.

•Need innovative solutions to overcome troubles.

•Utilize Accelerated Bridge Construction  (ABC) methodology.

•Geography (water, mountains)
•Congestion (difficult to continuously move crane, traffic safety)

•philosophy to be innovative and not bound by traditional methods.

Special Hanging Lifter working in Canada

Machine passing through tunnel to erect huge box beam of high-speed railway bridge